When I talk about sprint planning tools, I’m really talking about predictability, alignment, and quality. These tools are where a team turns intent into a realistic plan: a clear sprint goal, a right-sized sprint backlog, and a shared understanding of what “done” looks like. Done well, sprint planning reduces last-minute firefighting, clarifies priorities, and gives stakeholders trustworthy visibility into what’s coming next.
This guide is for product owners, scrum masters, engineering managers, and team leads who want practical recommendations—grounded in agile and Scrum best practices—without tool evangelism. My focus is a tool-agnostic framework that anyone can apply: selection criteria you can reuse, checklists you can run before a planning session, and templates to keep your process consistent. You’ll also find tips for choosing top sprint planning tools and how to spot free sprint planning tools that still cover the essentials.
Recommended products at a glance
Lark: Unified workspace that brings chat, docs, meetings, tasks, and Base together for async‑first sprint planning with automation, dashboards, and approvals.
Jira Software: Deep Scrum workflows and classic reports that scale across teams with strong governance and auditability.
Azure DevOps: Microsoft‑centric planning with boards, repos, pipelines, and test plans tightly connected to delivery signals.
ClickUp: All‑in‑one hub blending tasks, docs, whiteboards, dashboards, and automations for flexible sprint workflows.
Linear: Fast, opinionated issue tracking that promotes tight scopes, clean backlogs, and momentum from plan to ship.
YouTrack: Highly customizable workflows and robust agile reporting tailored to your team’s process and quality gates.
Zenhub: GitHub‑native planning that layers epics, boards, and reports directly on issues to minimize context switching.
Asana: Approachable cross‑functional planning with lists, boards, goals, and lightweight automation for inclusive sprints.
Trello: Visual, card‑based boards that make lightweight sprints simple with templates, labels, and checklists.
What is sprint methodology
Sprint methodology is an agile approach that delivers value in short, fixed timeboxes called sprints. Each sprint follows a clear loop: plan, build, review, and improve. The sprint cycle is a core part of the scrum framework, involving the scrum team in planning, building, reviewing, and improving each sprint. You set a sprint goal, select the highest‑value backlog items, and commit to a realistic scope based on capacity and velocity. At the end, you demo results, inspect progress with burndown or cumulative flow, and run a retrospective to refine how you work.
Where sprint planning tools shine:
They turn ideas into structured backlog items with acceptance criteria and help teams prioritize tasks to ensure the most valuable work is addressed first.
They support estimation and capacity planning, so scope matches availability.
They provide transparent reports—burndown, burnup, and forecasting—for quick decisions.
They enable async collaboration with comments, docs, and clips, keeping meetings lean.
They integrate with repos and CI/CD to link plan and code, reducing context switching.
What are sprint planning tools and why they matter
At their core, sprint planning tools support the Scrum ceremony where a team commits to a realistic slice of work. They help the product owner articulate priorities, the team estimate and validate capacity, and everyone agrees on the sprint goal and definition of done. The best tools for sprint planning act as connective tissue across ceremonies: refinement, planning, daily scrums, the sprint review, and the retrospective.
Here’s how I frame their value:
Predictability: Good tools surface true capacity, historical velocity, and current work-in-progress, so the team avoids overcommitment. A clean sprint backlog, paired with a sprint goal, keeps scope intentional rather than accidental.
Visibility: Boards, burndown and burnup charts, and cumulative flow diagrams make work status transparent to the team and stakeholders, providing a clear visual representation of work progress and planning. These visual representations help teams and stakeholders quickly understand the status and priorities. When priorities change, visibility helps you renegotiate scope instead of silently slipping.
Alignment: A documented sprint goal and acceptance criteria anchor decisions. Integrations with docs, chat, source control, and CI/CD connect planning to execution, making “why” and “what” easy to trace. Sprint planning tools also support agile ceremonies such as sprint planning, daily standups, sprint reviews, and retrospectives, which foster collaboration and continuous improvement. For example, you can align content in Lark Docs and align text in Sheets.
Quality: The definition of done (DoD) and workflow gates ensure each story meets a shared quality bar before it’s moved to “done.” This reduces rework and stabilizes delivery.
The must-have features for sprint planning tools
Choosing sprint planning tools is simpler when I break the requirements into six must-have categories. These capabilities reflect common constraints across Scrum teams, hybrid teams, and cross-functional product groups.
Backlog and board capabilities you’ll actually use
Clear structure reduces friction in refinement and planning. When the backlog reflects reality, the planning meeting can focus on decision-making instead of clean-up. Whether you pick from top sprint planning tools or start with free sprint planning tools, these basics are non-negotiable.
Estimation and capacity planning for right-sized sprints
Estimation and capacity planning keep sprints right‑sized. Tools should support collaborative story point estimation and make totals clear while building the sprint backlog. Trend views of historical velocity help calibrate commitments with real delivery history. Capacity inputs for team availability prevent overcommitment, and easy timeboxing lets you set and adjust sprint durations.
Visibility and reporting that stakeholders trust
Make progress obvious. Use burndown and burnup charts to track pace and scope changes. Read cumulative flow diagrams to spot growing queues or bottlenecks. Add simple forecasting based on throughput or velocity to flag risk early. Share project dashboards so teams and stakeholders get quick, clear context. Why this matters: when progress is visible, you can renegotiate scope or reduce risk before surprises stack up. Many top sprint planning tools shine here with clean, readable dashboards.
Collaboration and async planning to reduce meeting load
Keep context close to the work with comments, mentions, and threads. Lean on whiteboards and doc integration to capture the sprint goal, split stories, and log risks in one place. Short video clips can replace long meetings for clarification or demos.
Governance and quality that scale beyond one team
Bake quality into the workflow. Enforce the definition of done with required fields or gates. Add approvals and reviews for sensitive changes or compliance-heavy work. Maintain an audit trail for scope, status, and ownership changes.
Best 9 sprint planning tools: when to use each and why they stand out
1. Lark: unified workspace for async-first sprint planning
Overview
Lark unification makes sprint planning feel natural and less fragmented. I can capture a sprint goal in a doc, discuss trade-offs in chat, turn decisions into tasks, and track the sprint backlog in a structured base—without hopping across apps. For hybrid and distributed teams, that cohesion lowers friction and keeps context intact. The platform leans into async collaboration with comments, mentions, and lightweight video clips, which helps reduce meeting time while preserving clarity. Among sprint planning tools, this integrated feel supports momentum.
Key features for sprint planning
Unified platform that ends tool sprawl:
Lark brings chat, docs, calendar, tasks, and the collaborative database (Base) into one place. No more hopping between fragmented apps to plan and track a sprint. Teams work in a single, consistent space: define the sprint goal in Docs, discuss trade‑offs in Chat, capture decisions as Tasks, and track scope in Base. The result is less context switching, higher execution speed, and better transparency for everyone from engineers to stakeholders.
Lark Base: multi‑view planning plus automation:
Automated workflow: cut busywork, keep sprints flowing

Lark Base turns routine coordination into simple, reliable automation, so teams spend less time updating boards and more time delivering. You set event triggers—form submissions, record updates, status changes, or time‑based rules—and Base handles the follow‑through. It can auto‑assign owners, set SLAs, route requests to the right squad, generate follow‑up tasks, and send smart alerts in chat at the moments that matter. This event‑driven flow reduces status drift across sprint planning tools and helps teams keep a steady cadence.
Dashboards and views: see the plan, the flow, and the risks at a glance

Lark Base makes the plan visible from every angle. Switch between Kanban, grid, calendar, and Gantt views to match each moment—refinement, capacity checks, sequencing, or mid‑sprint tracking—without rebuilding anything. Link dashboards to repo and CI/CD fields to minimize context switching and keep status honest across tools for sprint planning. Stakeholders get a clean summary—goal, scope, risks, progress—while the team uses fast boards for standups and reviews. This clarity helps you compare options among top sprint planning tools using a common information structure.
Async‑first collaboration for remote and distributed teams
Lark Docs makes async collaboration effortless by bringing Doc writing and meeting workflows into the same unified workspace used by your sprint planning tools. In Lark Docs, teams co‑author specs, RFCs, and sprint goals with rich comments, inline tasks, version history, and @mentions that keep discussions tied to the work. Docs link directly to boards and records, so context never gets lost when you switch between tools for sprint planning.
Lark Meetings are just as streamlined: schedule with Calendar, attach the agenda Doc, auto‑collect notes and action items, and record with transcripts and highlights that post back to the relevant Doc or chat channel. This flow cuts status drift and makes decisions easy to trace—whether you’re comparing top sprint planning tools or piloting alongside free sprint planning tools.
Lark Tasks: Sprint management for crisp execution
You can create, break down, and assign tasks in seconds through Lark Tasks. Then, just set due dates, reminders, and dependencies to keep momentum through the sprint. Your sprint goals, prioritization, and progress remain visible to the whole team, from backlog to demo.
Approval automation for clean, auditable decisions

Lark Approval streamlines decisions that often slow teams down, making it a strong complement to sprint planning tools. Budget approvals, resource requests, and scope changes flow through clear, trackable requests that stay tied to the work, so status is always visible across tools for sprint planning. You can set auto‑approval rules, conditional routing, and gentle reminders to prevent bottlenecks—no more manual chasing—while stakeholders review in chat or from linked records.
Best for
Teams seeking an all-in-one, async-first system where planning, discussion, and execution live together.
Cross-functional squads that need docs and tasks in the same place as sprints and checklists.
Startups to mid-size orgs that want fewer tools and tighter context, with flexibility to shape lightweight processes among top sprint planning tools.
Pricing
Lark offers a free plan suitable for small teams to explore core collaboration and planning flows, which makes it a viable entry among free sprint planning tools. Paid tiers add advanced administration, security, larger limits, and automation capacity. Pricing varies by edition and add-ons; I suggest reviewing the official plans to map features to your compliance and scale needs. Learn more about Lark pricing plan here:

You can also 👉Try Lark’s Savings Calculator: Switching to Lark’s Pro plan can lead to significant cost savings— for example, a 100-employee company using Slack, Google Workspace, and Airtable could save approximately $25,200 annually by consolidating their tools with Lark.
2. Jira Software: deep workflows and classic Scrum reporting

Image source: jira.com
Overview
Jira Software is a staple among top sprint planning tools, known for deep Scrum support and configurable workflows. It provides robust issue types, backlogs, boards, and reports. Many engineering organizations standardize on Jira because it scales across multiple teams and supports governance. You can tailor workflows to your process and enforce quality gates, which is useful when you need consistency and traceability across squads.
Key features for sprint planning
Backlog management with epics, stories, and acceptance criteria; bulk edit and refinement flows.
Estimation with story points, velocity charts, and sprint planning that respects capacity signals.
Reports like burndown, burnup, and cumulative flow to monitor progress and scope changes.
Dashboards for teams and leadership, with gadgets to visualize key metrics across sprint planning tools.
Best for
Mid-size to large product organizations that require mature Scrum features and consistent governance.
Teams that need detailed reporting, audit trails, and customizable workflows.
Multi-squad environments where standardized processes improve alignment and predictability using trusted tools for sprint planning.
Pricing
Jira provides a free tier for small teams with core capabilities, making it a contender among free sprint planning tools for initial trials. Paid tiers add user capacity, advanced permissions, audit logs, and premium administration. Costs depend on user count and plan level. Review tier features to align with your reporting, compliance, and scale requirements before committing.
3. Azure DevOps: planning embedded in a Microsoft-centric stack

Image source: microsoft.com
Overview
Azure DevOps combines repos, pipelines, boards, and test plans in a single ecosystem, which helps connect planning to delivery. For organizations centered on Microsoft services, this consistency reduces integration overhead. Sprint planning benefits from unified identity, permissions, and pipelines that bring build and test signals close to the backlog, improving the fidelity of planning decisions across sprint planning tools.
Key features for sprint planning
Product backlogs, sprint backlogs, and boards with queries for refined filtering.
Estimation and capacity inputs that support realistic scoping of a sprint.
Process templates and rules to reflect your definition of done and review steps.
Wiki and work item linking for clarity on context, risks, and acceptance criteria in tools for sprint planning.
Best for
Microsoft-centric teams that want planning, code, and CI/CD under one roof.
Organizations that value integrated governance, identity, and compliance alignment.
Mid-size to enterprise groups with multiple teams coordinating across shared services, choosing from top sprint planning tools.
Pricing
Azure DevOps offers a free tier for individuals and small teams with core boards and repos features. Paid options increase users, storage, and advanced features. Pricing varies by component and scale; check plan specifics against your pipeline and compliance needs. A small pilot on the free tier—similar to other free sprint planning tools—can validate fit before expanding.
4. ClickUp: all-in-one work hub with sprint capabilities

Image source: clickup.com
Overview
ClickUp is an all-in-one work hub that blends tasks, docs, whiteboards, and dashboards. It offers flexible structures to support agile workflows without forcing a strict mold. For sprint planning, you can keep agendas, stories, and checklists close together, which helps teams align quickly and execute with fewer handoffs while comparing sprint planning tools side by side.
Key features for sprint planning
Backlogs and sprints with configurable statuses and custom fields.
Docs and whiteboards linked to tasks for sprint goals, acceptance criteria, and story mapping.
Dashboards that visualize burndown, throughput, and workload.
Templates for sprint ceremonies, DoD checklists, and planning agendas.
Integrations with repos, chat, and calendars to sync signals and ceremonies.
Automations to reduce manual coordination and keep processes consistent across tools for sprint planning.
Best for
Cross-functional teams that want planning and documentation in a single platform.
Squads that rely on visual collaboration for story mapping and risk discussion.
Teams that need flexibility to adjust workflows as the process matures among top sprint planning tools.
Pricing
ClickUp provides a free plan suitable for small teams to validate planning flows. Paid tiers add advanced features, permissions, automation capacity, and higher limits. Costs scale with users and capabilities, so map your needs—dashboards, security, and integrations—before choosing a plan. As with other free sprint planning tools, the entry tier helps you pilot without risk.
5. Linear: fast, opinionated, and focused on momentum

Image source: linear.com
Overview
Linear is fast and opinionated, designed to keep teams focused on execution with minimal clutter. The interface guides you toward clean backlogs, tight scopes, and clear workflows. For sprint planning, its speed and simplicity encourage disciplined habits: small stories, crisp priorities, and smooth transitions from planning to delivery across sprint planning tools.
Key features for sprint planning
Rapid issue capture and triage with clear project and label structures.
Lightweight estimation and velocity awareness to right-size scope.
Boards and cycles that make sprint planning and tracking straightforward.
Integrations with GitHub/GitLab and chat to keep context in flow.
Keyboard-driven UX and clean defaults that lower planning friction.
Roadmap and cycle analytics to connect goals to outcomes, similar to other tools for sprint planning.
Best for
Product teams that value speed, focus, and a low-noise environment.
Small to mid-size software teams that want a gentle way to standardize planning.
Groups that prefer strong defaults over deep customization within top sprint planning tools.
Pricing
Linear offers a free option for small teams to experience core workflows. Paid plans unlock additional features, permissions, and scale. Review limits and required integrations to determine when a paid tier is warranted. The free tier, like other free sprint planning tools, is sufficient for pilots and early adoption.
6. YouTrack: flexible workflows with strong agile reporting

Image source: jetbrains.com
Overview
YouTrack emphasizes customization and agile reporting. It lets you mold workflows, fields, and states to match your process, while providing solid Scrum metrics. That flexibility helps teams codify their definition of done and enforce quality without building everything from scratch. For planning, the configurability can be a strong asset when you have unique constraints compared with other sprint planning tools.
Key features for sprint planning
Custom fields, workflows, and states that reflect your planning and quality gates.
Backlog and sprint boards with estimation and velocity support.
Reports including burndown and cumulative flow to monitor work-in-progress.
Dashboards tailored for teams and stakeholders, improving visibility across tools for sprint planning.
Best for
Teams that want tailored processes and robust agile metrics.
Groups operating under specific governance or quality requirements.
Mid-size teams that value flexibility without excessive complexity among top sprint planning tools.
Pricing
YouTrack includes a free tier for small teams with essential features. Paid tiers expand user capacity, customization options, and administrative controls. As with other tools for sprint planning, compare tiers against your needs for reporting, compliance, and integration depth. The free option places it among credible free sprint planning tools for pilots.
7. Zenhub: GitHub-native planning with minimal context switching

Image source: zenhub.com
Overview
Zenhub layers planning directly on top of GitHub issues, keeping developers close to the work surface they already use. Planning, execution, and code reviews live in one ecosystem. This reduces context switching and makes sprint planning more grounded in actual development activity, which many sprint planning tools aim to achieve.
Key features for sprint planning
Boards, epics, and roadmaps built around GitHub issues.
Estimation and velocity tracking within the GitHub-centric workflow.
Burndown and other agile reports visible alongside repositories.
Support for cross-report planning to manage multi-service backlogs across tools for sprint planning.
Best for
Teams that live in GitHub and want planning to happen without leaving it.
Small to mid-size engineering squads seeking low-friction sprints.
Groups that prioritize code-centric workflows over extensive customization among top sprint planning tools.
Pricing
Zenhub provides options suitable for small teams getting started, along with paid plans for larger groups and advanced features. If you want a trial akin to free sprint planning tools, start with the entry plan or trial period to validate fit. Upgrade when you need more scale, permissions, or portfolio views.
8. Asana: approachable planning for cross-functional work

Image source: asana.com
Overview
Asana is approachable and works well for cross-functional collaboration. While it’s not exclusively a Scrum tool, it supports sprint-like cycles with lists, boards, and goals. The gentle learning curve helps broaden participation, which is valuable when product, design, and business partners join sprint planning and need clarity without complexity compared with heavier sprint planning tools.
Key features for sprint planning
Boards and lists for backlog and sprint views, with custom fields for estimation.
Goals and roadmaps to align sprint intent with broader initiatives.
Templates for planning meetings, DoD checklists, and recurring workflows.
Automation rules that standardize steps and reduce manual tasks—handy in many tools for sprint planning.
Best for
Teams mixing product and business work that benefit from a familiar interface.
Groups that need inclusive planning with low onboarding overhead.
Small to mid-size teams building habits before scaling process depth among top sprint planning tools.
Pricing
Asana offers a free plan that covers basic boards, lists, and collaboration features, making it one of the free sprint planning tools suitable for early sprints. Paid plans add advanced reporting, permissions, and administration. Assess plan limits and the need for portfolio views or integrations as you grow.
9. Trello: visual simplicity for lightweight sprints

Image source: trello.com
Overview
Trello is a visual, card-based tool that excels at simplicity. It’s easy to grasp and helps teams storyboard sprint goals, break down work, and track progress on a clear board. While lighter than some Scrum platforms, Trello can support lightweight sprints well, especially for smaller teams or those experimenting with agile practices, and it stands out among straightforward sprint planning tools.
Key features for sprint planning
Lists for “Backlog,” “Next sprint,” and “In progress,” with checklists for acceptance criteria.
Labels, custom fields, and templates to standardize stories and DoD steps.
Easy collaboration with comments, mentions, and attachments right on cards—useful across many tools for sprint planning.
Best for
Small teams or cross-functional groups that want a clear visual board.
Teams piloting sprints without heavy configuration needs.
Educators, agencies, and non-engineering squads adapting agile-lite workflows and testing top sprint planning tools.
Pricing
Trello includes a free plan that covers boards, lists, cards, and basic Power-Ups, placing it firmly among free sprint planning tools for simple workflows. Paid tiers unlock advanced automation, admin controls, and more Power-Ups per board. Choose based on your need for reporting, permissions, and integration scale.
If you want fewer apps and tighter context, Lark is worth a look. Its unified docs, chat, calendar, tasks, and database help sprint planning move from scattered to seamless, supporting clarity and momentum with less overhead—especially helpful when shortlisting free sprint planning tools to start small and scale later.
Lark templates to accelerate your next sprint planning
I like templates that remove guesswork and keep us focused on outcomes. You can recreate the following in most sprint planning tools. I’ll describe them in Lark for concreteness, since it combines docs, tasks, chat, calendar, and a flexible database.

Sprint planning agenda template: Sprint planning meetings are crucial for any agile team. They set the stage for the work to be done in the upcoming sprint, and ensure that everyone is on the same page. However, without a proper structure, these meetings can easily become chaotic and unproductive. That’s where our Sprint Planning Meeting Template comes in.
👉 Try sprint planning meetings template
Sprint retrospective template: Sprint retrospectives are a key part of the agile methodology, providing a structured way for teams to reflect on their work and identify areas for improvement. This template allows you to record the details of each sprint, including the participants, what went well, what didn’t go well, ideas for improvement, action items, the owner of each action item, and the due date for each action item. By using this template, you can ensure that your team is continually learning and improving, and that no important insights are lost.
👉 Try sprint retrospective template
Other agile templates
Scrum template: Scrum teams have clearly defined roles: a Product Owner who manages the product backlog, a Scrum Master who facilitates the process, and the Development Team who executes the work. Key events include sprint planning, daily stand-ups, sprint reviews, and sprint retrospectives. The scrum team works collaboratively during each sprint, engaging in these events to plan, coordinate, and reflect together to achieve shared goals and drive continuous improvement. It’s a highly structured approach designed for Agile teams to create a rhythm of delivery and reflection.
👉 Try Scrum template

Kanban template: The core goals of Kanban are to visualize work, limit work in progress (WIP), and maximize efficiency by focusing on a continuous flow of tasks rather than fixed sprints. It’s highly flexible and excellent for Agile teams with varying priorities. A visual Kanban board template in Lark is perfect for this, helping your Agile team see progress at a glance and identify bottlenecks instantly with its intuitive drag-and-drop interface.
👉 Try Kanban template

How to choose sprint planning tools: a practical decision framework
Step 1: Clarify team context and constraints
Questions to answer: How many people plan and execute? Remote or hybrid? Any compliance or audit needs? What budget do you have now, and what could you add later?
What to avoid: Overbuilding for edge cases. Start with real needs, not hypothetical ones.
Step 2: Define required integrations and data flows
Map your core systems: source control, CI/CD, docs, chat, calendar, and identity (SSO).
Decide which signals must show up in the planning surface: commits, pull requests, build status, test results, and release notes.
Tip: Shallow integrations can create status drift. Verify integration depth early when comparing sprint planning tools and top sprint planning tools.
Step 3: Identify reporting needs
Must-have reports: burndown, burnup, and cumulative flow for flow health.
Who needs what: the team needs real-time signals; leaders need roll-ups and trends; stakeholders need simple, honest views.
Consider forecasting: basic projections based on throughput or velocity support risk calls. Most tools for sprint planning include these signals.
Step 4: Evaluate onboarding friction and time-to-value
Try a realistic pilot: import a subset of the backlog, configure a basic workflow, and run a full sprint cycle.
Watch for friction: slow board interactions, clunky estimation, or confusing permissions.
Aim for quick “first value”: if setup takes too long, adoption will stall. Free sprint planning tools make it easier to pilot before you commit.
Step 5: Total cost of ownership
Account for licenses, add-ons, admin overhead, and context switching across apps.
Balance customization against maintenance. Simple, clear workflows usually age better than elaborate ones.
Consider scalability: can you add teams and keep reporting coherent?
Conclusion
The journey to better sprints is practical. Clear templates keep planning focused. A simple decision framework keeps tool selection honest. When you anchor on outcomes—predictability, visibility, and quality—your sprint planning tools become a force multiplier instead of overhead.
Pilot with clear success metrics and a short feedback loop. Keep configuration light at first, then add structure to protect quality and visibility. If a tool raises friction, rethink rather than push through. When choosing among top sprint planning tools, clarity of fit matters more than brand recognition.
If you prefer a unified workspace where docs, chat, calendar, tasks, and a flexible database live together, Lark is worth trying. It reduces context switching and makes planning, decisions, and follow-through feel seamless across the sprint.
FAQs
What tool is used for sprint planning?
Multiple options work well. I suggest shortlisting two or three sprint planning tools that match your context, such as Jira Software for deep Scrum workflows, Azure DevOps for Microsoft-centric stacks, or ClickUp and Lark for all-in-one collaboration. If you’re GitHub-native, Zenhub fits naturally. Start with a small pilot and keep configuration minimal. Free sprint planning tools are useful when validating fit.
Is Jira used for sprint planning?
Yes. Jira Software is widely used for backlog refinement, estimation, capacity checks, and sprint planning. It offers burndown, burnup, and velocity views, plus customizable workflows to enforce your definition of done. Pair it with Confluence for agendas and a sprint goal canvas if you want docs next to boards. It is regularly listed among top sprint planning tools.
What are the 3 C’s in sprint planning?
A common shorthand is Card, Conversation, and Confirmation. The Card represents the story, the Conversation clarifies intent and scope, and the Confirmation captures acceptance criteria. Good tools for sprint planning make each step visible and traceable, so decisions stick and quality improves.
How to plan sprint planning?
Keep it simple and outcome-driven:
Prepare: refine top backlog items, confirm acceptance criteria, and estimate collaboratively.
Align: set a sprint goal, check capacity and velocity, and agree on scope boundaries.
Commit: finalize the sprint backlog, highlight risks, and confirm your definition of done.
Follow through: set up dashboards (burndown, burnup, cumulative flow), integrate repo and CI/CD signals, and schedule a quick mid-sprint check.
Use templates for the agenda, DoD, and capacity planner. Many free sprint planning tools support these basics; the key is clarity and consistency.